Technology
Edilteco's supporting technology

EPS
Separation
Plant

Tomorrow's plant. Today.

Integrated system for recovering EPS from cementitious construction waste.

EPS Separation Plant
Production capacity
Continuous operation
separates cement and aggregates
Personnel
1
operator required
Space
60 m²
150 m² including storage area
Electrical power
—
confirmed during plant specification

Process overview

The EPS Separation Plant recovers EPS waste mixed with cement and aggregates, and turns it into a new raw material for lightweight concrete and other construction products.

EPS-containing waste from demolition and refurbishment has always been very difficult to recover. Dedicated separation processes give it a second life.

Benefits for licensees

The recovered beads are fed into the Politerm® Evolution Plant and treated with E.I.A., which makes them compatible with cementitious mixes again and turns them into Politerm® R.